You are the NACE Level 2 Inspector with the final responsibility to prepare the final report for a very large structural steel shop project which has gone very well. It is due next week. The work has been ongoing for two years and several NACE Level 1 inspectors have worked under your supervision throughout the project. You find you are missing one week of daily reports for the night shift from the very beginning of the project and despite your best efforts they are cannot found. Your FIRST preferred course of action is to:
A. Re-create the reports as not much was going on during the night shift anyway
B. Plainly state in your report that they are missing
C. Do not complete your report until they can be found
D. Use creative writing to cover the fact they are missing
You have just your NACE CIP Level 2 certification when you are asked to supervise a team of uncertified field pipeline inspectors.
Your FIRST preferred course of action is to:
A. Accept assignment without hesitation
B. Advise the prospective employer that you cannot accept the position
C. Meet with the prospective employer to scope of your role
D. Review the NACE Attestation prior to making a decision
The most likely area of failure on a buried external pipeline coating is the:
A. Mainline coating
B. Field joint coating
C. Areas exposed to Ultra Violet light
D. Ground bed
Generally for safety considerations, water jetting hose connections use
A. an oil/water separator
B. a long wand
C. a whip-lock device
D. filters
[ 此帖被郑桂芬在2023-03-07 09:46重新编辑 ]